PANG

Initial Operational Capability (IOC) : 2038
Total Production : 1

Model Status Year Produced
PANG Under Development 2038 1



PANG

Group : Aircraft Carriers
Status : Under Development
Origin : France
Contractors : Naval Group*, Chantiers de l'Atlantique, Dassault-Aviation, TechnicAtome
Initial Operational Capability (IOC) : 2038
Total Production : 1

The French Navy PANG is a new program being carried out by the Naval Group launched in December 2020 and intended to deliver a next generation aircraft carrier in the late 2030s as replacement for the Charles de Gaulle. The new aircraft carrier will feature a larger displacement, a nuclear propulsion system utilizing K22 power reactor, and up to 30 FCAS combat aircraft. The French Navy expects to commission the 75,000-ton PANG by 2038 with the construction slated to start by 2025.

Operators
Country Status State Notes
FrancePlanned 1
Specifications
Notes
Crew 2000
Number of Aircraft 30
Number of Engines 1
Dimensions
Length 300 meter
Mass
Full Displacement 75,000 ton
Power
Total Combined Power 220 MW
Speed
Top Speed 27 knot
Gear
Airborne Early Warning Aircrafts
E-2D Advanced Hawkeye
Multi-Role Fighters
Future Combat Air System
Rafale M
Listing
Ship Status Com Decom
PANG Planned 2038

News

Tuesday, 8 December, 2020
France Launches Study for Charles de Gaulle Aircraft Carrier Replacement

The President of the Republic announced the launch of studies for the replacement of the Charles de Gaulle aircraft carrier by a new nuclear-powered aircraft carrier by 2038.

Photo Gallery

Notes

* Prime Contractor
State Latest Known holdings/Original Procurement
Com - Date of Commissioning
Decom - Date of Decommissioning

An unhandled error has occurred. Reload 🗙

Copyright © 2003-2025 deagel.com website. All rights reserved.