PANG
Initial Operational Capability (IOC) : 2038
Total Production : 1
Model | Status | Year | Produced |
---|---|---|---|
PANG | Under Development | 2038 | 1 |
PANG
Group : Aircraft Carriers
Status : Under Development
Origin : France
Contractors : Naval Group*, Chantiers de l'Atlantique, Dassault-Aviation, TechnicAtome
Initial Operational Capability (IOC) : 2038
Total Production : 1
The French Navy PANG is a new program being carried out by the Naval Group launched in December 2020 and intended to deliver a next generation aircraft carrier in the late 2030s as replacement for the Charles de Gaulle. The new aircraft carrier will feature a larger displacement, a nuclear propulsion system utilizing K22 power reactor, and up to 30 FCAS combat aircraft. The French Navy expects to commission the 75,000-ton PANG by 2038 with the construction slated to start by 2025.
Operators
Country | Status | State | Notes |
---|---|---|---|
![]() | Planned | 1 |
Specifications
Notes | ||
---|---|---|
Crew | 2000 | |
Number of Aircraft | 30 | |
Number of Engines | 1 | |
Dimensions | ||
Length | 300 meter | |
Mass | ||
Full Displacement | 75,000 ton | |
Power | ||
Total Combined Power | 220 MW | |
Speed | ||
Top Speed | 27 knot |
Gear
Airborne Early Warning Aircrafts | ||
---|---|---|
E-2D Advanced Hawkeye | ||
Multi-Role Fighters | ||
Future Combat Air System | ||
Rafale M |
Listing
Ship | Status | Com | Decom |
---|---|---|---|
![]() |
Planned | 2038 |
News

The President of the Republic announced the launch of studies for the replacement of the Charles de Gaulle aircraft carrier by a new nuclear-powered aircraft carrier by 2038.
Photo Gallery
December 2020

Fench Navy PANG aircraft carrier
Notes
State Latest Known holdings/Original Procurement
Com - Date of Commissioning
Decom - Date of Decommissioning